The group standards of China Electric Power Planning & Engineering Association (shorted as CEPPEA standards), aiming at meeting the needs of market and innovation, pay attention to the whole process of EPC projects and focus on new technologies, new industries, new format and new business pattern. In 2017, the CEPPEA launched the group standards work, and in 2018, it was approved as the second batch of group standards pilot organizations by Standardization Administration. During the past five years, the CEPPEA has steadily promoted the preparation of group standards by establishing and improving relevant management systems, standard systems and organizational structure.
The CEPPEA has disclosed its issued group standards since 2020, and the member units and the public can consult or download them free at the website http://pes.sunther.com/. Click the Standard Name and all the basic information of the standard will be displayed, including the name of the standard, English translation of the standard, International Standard Classification No., Chinese Standard Classification No., date of issuance, date of implementation, applicable scope, drafter, drafting organization, etc. Members and the public are welcome to skimming and provide valuable comments and suggestions.
To date, 28 issued CEPPEA standards have been listed on the website. The list of standards is as follows:
S/N
Standard Classification No.
Standard Name
Issuance Date
Implementation Date
1
T/CEPPEA 5001.1-2018
Standard for digital products of electric power engineering Thermal power plant
2018.9.11
2018.11.11
2
T/CEPPEA 5001.2-2019
Standard for digital products of electric power engineering Transmission and substation
2019.9.10
2020.1.1
3
T/CEPPEA 5002-2019
Code for management of engineering procurement construction (EPC) power projects
2019.7.1
2020.1.1
4
T/CEPPEA 5003-2020
Design specification for 35kV~110kV substation monitoring and control system
2020.2.19
2020.5.1
5~16
T/CEPPEA 5004.1-2020~
T/CEPPEA 5004.12-2020
Regulation for content and depth of detailed design documents of conventional island for nuclear power plant (12 Parts)
2020.7.24
2020.11.1
17
T/CEPPEA 5005-2020
Technical specification of environmental impact assessment for power grid plan
2020.9.29
2020.9.29
18~23
T/CEPPEA 5006.1-2021~
T/CEPPEA 5006.6-2021
Specification of documents collection and archives arrangement of EPC project (6 Parts)
2021.04.13
2021.7.1
24
T/CEPPEA 5007-2021
Code for geotechnical engineering investigation of substation and distribution under 35 kV
2021.7.20
2022.1.1
25
T/CEPPEA 5008-2021
Code for geotechnical engineering investigation of urban cable line
2021.7.20
2022.1.1
26
T/CEPPEA 5009-2021
Design specification for 35kV~110kV substation relaying protection and security automatic equipment
2021.11.4
2022.2.1
27
T/CEPPEA 5010-2021
Technical code for ground treatment of sand-gravel cushion in electric power engineering
2021.11.18
2022.2.1
28
T/CEPPEA 5011-2021
Design guide for thermal power plant of chemical system intellectualization
2022.1.19
2022.5.1
相关文章:- 2023-06-25 The 4th Meeting of the 9th Council ...
- 2023-05-18 The 2023 Talent Fostering Meeting o...
- 2022-10-24 The 2022 International Business Exp...
- 2022-08-18 The 2022 New Energy Market Developm...
- 2022-05-25 The CEPPEA 2021 statistical informa...
- 2022-02-17 2021 CEPPEA Annual Meeting Held in...
- 2021-12-01 The 2021 Annual Symposium of the So...
- 2021-09-29 The 2021 Power Generation Market Bu...
- 2021-08-30 Industrial Reform and Development D...
- 2021-08-04 The Organizing Committee Meeting of...
当前位置: 首页 > CEPPEA news > CEPPEA news